Addendum to NIT

$
0
0

                                                                                         March 21, 2025

BPC/TOMD/TOMS-PLING/08/2025/09          

In reference to NIT: 08/TOMS/BPC/PLG/2025/104 dated 26th Feb, 2025, TOMS, Phuentsholing under TOMD, TD would like to announce that the bid submission for the following works has been extended till 28th March, 2025.

SL No                                              Work DescriptionBid security Amount (Nu)   Work Category
  1Package 1: Resurfacing bituminous access road from Doyamara bridge to the upper yard of the 400kV BPC Malbase Substation at Pasakha.      26,000.00          W1
  2Package 2: Repair and maintenance of control room building and transit camp at 220kV Dhamdum Substation, Samtse and installation of PPGL new ceiling for control room at Gomtu.       27,800.00           W3
E-Tenders must be submitted via SAP-Ariba procurement system not later than 28 March, 2025, before 2:00 PM and it will be opened on the same day at 3:00 PM in the BPC Conference Hall at Phuentsholing.The original Bid Security must reach TOMS, P/ling office within three working days after submission of the bid. Bidders are permitted to bid for both the Packages; however the Tender committee reserve the right to accept or reject the bid.